Ongoing Projects
Major
- Interdisciplinary Academic Building
- New building for the School of Human Ecology located between Carroll Building and Information Technology Building.
- Military Science
- A new building for ROTC located behind lot 41 and next to University Police Department.
- Parking Lot 21 Construction
- Redesign and Construction of parking
- South Campus Infrastructure
- Building 404 Renovation
- Building 404 renovation is the renovation of the old Health Center. After the building is renovated half of the building will be a part of the counseling center. The other half that has a dividing wall will have SHE classes and offices.
- District Chiller Plant No. 2
- JI Clements Renovations
- Renovation to the field and suites. A new video board and sound systems is being installed, too.
- Russell Union HVAC Upgrades
- Upgrading HVAC system in the Russell Union during the Summer 2017
Minor
- Math/Physics Greenhouse relocation
- Provost Office Renovation in Marvin Pittman Building
- Expansion of District Chiller Plant No. 1
- Expanding District Chiller plant No. 1 located behind the Information Technology Building.
- Math/ Physics and Natural Sciences Fire Detection and Suppression upgrade
- New smoke and heat detectors are going to be installed in both Math/ Physics and Natural Sciences buildings. A sprinkler system will be installed into the Natural Sciences Building.
- RAC Multipurpose Trail
Other
- Hanner Lighting
- Newton Boiler Replacement
Last updated: 2/28/2018