Skip to main content

Ongoing Projects

 

Major

  • Interdisciplinary Academic Building
    • New building for the School of Human Ecology located between Carroll Building and Information Technology Building.
  • Military Science
    • A new building for ROTC located behind lot 41 and next to University Police Department.
  • Parking Lot 21 Construction
    • Redesign and Construction of parking
  • South Campus Infrastructure
  • Building 404 Renovation
    • Building 404 renovation is the renovation of the old Health Center. After the building is renovated half of the building will be a part of the counseling center. The other half that has a dividing wall will have SHE classes and offices.
  • District Chiller Plant No. 2
  • JI Clements Renovations
    • Renovation to the field and suites. A new video board and sound systems is being installed, too.
  • Russell Union HVAC Upgrades
    • Upgrading HVAC system in the Russell Union during the Summer 2017

 

Minor

  • Math/Physics Greenhouse relocation
  • Provost Office Renovation in Marvin Pittman Building
  • Expansion of District Chiller Plant No. 1
    • Expanding District Chiller plant No. 1 located behind the Information Technology Building.
  • Math/ Physics and Natural Sciences Fire Detection and Suppression upgrade
    • New smoke and heat detectors are going to be installed in both Math/ Physics and Natural Sciences buildings. A sprinkler system will be installed into the Natural Sciences Building.
  • RAC Multipurpose Trail

Other

  • Hanner Lighting
  • Newton Boiler Replacement

Last updated: 2/28/2018